
Add to Cart
Hot Rolled Coil Steel Galvanized Sheet Metal Rolls Regular Spangle Surface
Company and Production
1 we are both manufacter and trading company
A 15 years production experience.
B product be exported to more than 30 countries
C 2 prepainted galvanized steel production lines and 1 galvanized steel production line
2 Main product:
A prepainted galvanized steel coil (PPGI)
B prepainted gavalume steel coil (PPGL)
C galvanized and galvalume/aluzinc steel coil (GI & GL)
D prepainted galvanized steel plate and roofing tiles
3 Employee: More than 200
3. Product Description
Product name | Hot Dipped Galvanized steel Coil |
Thickness | 0.13mm-0.7mm |
Width | 750mm-1250mm |
Zinc coating | 40g-275g |
Standard | ASTM, AISI, DIN, GB |
Material | SGCC, DC51D, DX51D, DX52D, SPCC, SGCD, Q195, Q235, SGHC |
Surface structure | Zero spangle, regular spangle or normal spangle |
Surface treatment | Chromated and oiled, chromated and non-oiled |
Technique | Hot dipped |
Packing | Export standard |
Payment | T/T or L/C |
Min order | 25 tons (one 20FT FCL) |
Delivery time | 7-30days |
FAQ
1. What is recommendation?
Asia: Thickness: 0.18 / 0.19 / 0.21 / 0.24 / 0.26mm width 914/1000/1250mm, high gloss red, high gloss brown, clear varnish
Africa: Thickness0.25 / 0.26 / 0.27 / 0.28 / 0.3 / 0.38 / 0.4 / 0.45mm with 762/914/1000 /1250 mm width, red, green, blue, white
South America: Thickness 0.12 / 0.14 / 0.16 / 0.35 / 0.49mm with 914/1000 / 1220mm, red, green and blue color
2. What s the payment term?
30-50% TT in advance(based on your qty ), 70% balance against copy B/L in 7 workdays.
3. When will you arrange production?
In 7 workdays when we receive your advance payment.
4. When will you send BL copy?
In 3-5 workdays after shipment date.
5. When will you send original Documents
In 3-5 workdays when we get the balance.
6. From we pay the advance to we get the goods what other service you can provide?
A Send photos from raw material to shipment.
B Notice and remind you when will you get the goods.
C Advise or Solve when you meet the problem during your production